PMCARCHITECTS
 
Practice Services Projects Published Passive House Energy Consultancy Blog Contact Us

 

Conservation

Industrial
Education
Health Care
Leisure
Social Housing
 

 

Newry & Mourne Council Offices, Newry, Co. Down

This two storey office building is a prefabricated building and was assembled off site and ‘bolted’ together on site in three meter wide modular sections. The finishes were applied on site and this construction method by the McAvoy Group delivered a cost effective building within a short timeframe.

 

 

 
 
 
 
 
 

RIBA APM ConstructionLine Passivhaus Stroma PHT AECB  

© 2012 Paul McAlister Architects Limited

FacebookLinkedINTwitterFlickr