PMCARCHITECTS
 
Practice Services Projects Published Passive House Energy Consultancy Blog Contact Us

 

Conservation

Industrial
Education
Health Care
Leisure
Social Housing
 

 

Cregagh Primary School

This school had to be designed in such a way that the existing school was able to remain opening during the build. Responsible for scheme design for Phase 1  approval prior to demolishing remaining existing school buildings.

( Project Architect whilst at Knox & Clayton Architects Lisburn )

 

 

 
 
 
 

RIBA APM ConstructionLine Passivhaus Stroma PHT AECB  

© 2012 Paul McAlister Architects Limited

FacebookLinkedINTwitterFlickr